CM 47500: Construction Costs

2 Credits

Spring 2025Lecture
Spring 2025 Instructors(1)
Qingchun Li

A study of construction costs, including analysis of field records, job cost accounting, job cost control, and determination of unit prices.

Course CM 475 from Purdue University - West Lafayette.

Qingchun Li

Course Overview

Course GPA

GPA: 3.36
Grade Distribution% of Students
A
B
A: 54%
B: 39%
C: 4%
F: 4%

Data Averaged From:

Instructors1 instructor
Semesters1 semester

Qingchun Li - Metrics

3.36

Average GPA

No rating
found!

RateMyProf

% Grade Distribution

1 instructor selected
A+AA-B+BB-C+CC-D+DD-F07142128% of Students
  • Qingchun Li

GPA Trends

1 instructor selected
Total GPA avgerages are shown in the legend.
Higher values indicate higher average GPAs.

Spring 2025 Schedule:

Loading...

BoilerClassesis an unofficial catalog for Purdue courses made by Purdue students, based in West Lafayette, Indiana. We'd love to hear your feedback!